>> Albert Dock

Provided blasting and cleaning services during a crucial shutdown to the lock system for essential repair work to be carried out. All blasting and cleaning completed ahead of schedule.
 
Albert Dock
 
 

>> Port of Liverpool Dock Gate Repair

UHP works carried out on the gate included:

Surface preparation & Priming,
Cold Cutting,
Greenheart Removal.

 
 
  >> Port of Workington

UHP works carried out on the gate included:

Surface preparation & Painting,
Cleaning,
Greenheart removal.
 
 
  >> New Liverpool Landing Stage

Landing stage prepared and made safe for passenger access in summer 2006.
 
 
  >> Gladstone Outer Lock Gate

Worn lock gate pintals were removed from the granite surrounds. The operation took place inside a limpet dam.
   
         
 

>> North East Rail Tunnel

Time critical concrete repair carried during busy repair schedule.

 
 
  >> Stenna Pioneer

UHP repair of internal steel decks during dry docking.
 
 
  >> Stenna Line HSS

Aluminium surface preparation used on vessels such as the Stennaline HSS.
 
 
  >> Concrete Trimming

High pressure used to trim concrete sleepers ( this being a very high grade of concrete).
 
 
         
Home About Us Portfolio of Work Range of Uses Technical Data Contact Us
Copyright 2006 © UHP (UK) Ltd. All rights reserved. Privacy Policy