>>12 Keys Jetty

Project carried out on 12 keys jetty Liverpool and working within the operational requirements of the busy link between Birkenhead, Belfast and Dublin.
Following removal of the broken down non-skid surface a new non-skid service was laid.
 
12 Keys Jetty
 
  >> Furness Abbey

Complete outer shell blasting and painting completed on schedule for associated British ports.
 
Furness Abbey
 
  >> PDT Seal Sands

A two vessel dry docking program carried out for PDT’s port at the dry dock in North East England.
 
Seal Sands
 
 

>> PDT Heortnesse

The Heortnesse is a large dredger that required extensive surface preparation and painting in PDT's dry dock.

 
H
 
 

>> Albert Dock

Provided blasting and cleaning services during a crucial shutdown to the lock system for essential repair work to be carried out. All blasting and cleaning completed ahead of schedule.

 
Albert Dock
 
 

>> Port of Liverpool Dock Gate Repair

UHP works carried out on the gate included:

Surface preparation & Priming,
Cold Cutting,
Greenheart Removal.

 
 
  >> Port of Workington

UHP works carried out on the gate included:

Surface preparation & Painting,
Cleaning,
Greenheart removal.
 
 
  >> New Liverpool Landing Stage

Landing stage prepared and made safe for passenger access in summer 2006.
   
         
  >> Cold Cutting May 2008

UHP cold cutting project completed on time for Peel Ports on the lock gates refurbishment program.
 
Cold Cutting May 2008
 
  >> HSS Explorer - Working                                    in Belfast

Extensive hull blasting and painting carried out in the dry dock in Belfast. The HSS Explorer being a complex aluminum hulled vessel.
 
HSS Explorer
 
 

>> PDT Cleveland County

Project involved preparation work prior to dry docking and final painting.

 
Cleveland County
 
 

>> North East Rail Tunnel

Time critical concrete repair carried during busy repair schedule.

 
 
  >> Stenna Pioneer

UHP repair of internal steel decks during dry docking.
 
 
  >> Stenna Line HSS

Aluminium surface preparation used on vessels such as the Stennaline HSS.
 
 
  >> Concrete Trimming

High pressure used to trim concrete sleepers ( this being a very high grade of concrete).
 
 
  >> Gladstone Outer Lock Gate

Worn lock gate pintals were removed from the granite surrounds. The operation took place inside a limpet dam.
   